Site construction conditions of cable is generally bad, may be located in the preliminary construction of power plants, may also be located in the initial field of the newly built railway under construction, could the bridge rack, may also in the cable tunnel, in Flexible Cables sheath repair are due to the wild plastic welding torch, and plastic welding torch heating need 220 v alternating current (ac), and in the emerging field of engineering construction, the scene is generally lack of power, or the power supply may be due to the cable laying position, then brings the power supply to provide a certain difficulties, therefore, to achieve the sheath of the cable repair, on the one hand is the personnel in place, on the other hand is mainly to provide power supply, only prepared for the above two basic work, can realize the normal work of cable sheath repair and conduct.

For convenience of wire and cable repair work smoothly, the construction unit should equipped with wild small generators.At the same time at the scene repair convenient now provide the quality of the plastic welding torch.Nozzle heating area is larger, and the heating speed is faster. And cable alignment process randomness of damaged parts, in the plain of the general urban and region, the work is good, but in some mountain areas, due to receive the influence of complex topography, cable repair work is very difficult.

yundu654321 · 3268 days ago
Comments
Order by: 
Per page: 
 
  • There are no comments yet
   Comment Record a video comment
 
 
 
     
Post info
yundu654321
fashion nfl jersey 2013
17.04.2015 (3268 days ago)
Rate
0 votes
Actions
Recommend
 
Categories
Blogging for Money (5 posts)
Light Duty PVC Insulated PVC Sheathed Flexible installation Cable